Yeu and Noirmoutier OSS installation

General information

Client DEME Offshore (for EMYN)  
Project Yeu and Noirmoutier OSS installation 
Year 2024 
Location Pays-de-la-Loire 
Vessels Pioneering Spirit 
Max. water depth 25 m

Scope of work

  • Installation of substation jacket and topside
  • Engineering of installation plans and rigging
  • ROV survey work prior to and during installation
  • Assistance for levelling and grouting works

Project specials

  • Jacket and topsides lifts from third-party barge in the field
  • Fast-track project
  • Shallow water area requiring Pioneering Spirit  to operate at small draught
  • Sea conditions
  • Large number of stakeholders