Troll Phase 3

General information

ClientEquinor Energy AS 
ProjectTroll Phase 3 
Year2020 
LocationNorwegian Sea 
VesselsSolitaire, Oceanic 
Max. water depth300 m

Scope of work

  • Pull-in of 36-inch pipeline to Troll A platform
  • Installation of 26-km, 36-inch concrete-coated pipeline and two inline tees (ILTs)
  • Design, fabrication and supply of materials for laydown heads and installation aids