Statoil Sleipner Vest Alfa

General information

Client Statoil ASA 
Project Statoil Sleipner Vest Alfa 
Year 2004 
Location North Sea 
Vessels Lorelay 
Max. water depth 110 m (361 ft)

Scope of work

  • Installation
  • Trenching
  • Backfilling

Project specials

  • Post weld heat treatment
  • Flooded lay for stability
  • J-tube pull-in of riser pipe

Trunklines:

  • Crossing of LNG shipping channel by means of pipe pull over seabed
  • 4 midline tie-ins (on the sides of the shipping channel)
  • Shore pull-in of piggy-backed pipeline

Pipe characteristics

0.14/0.09 12 17 13% Cr
0.6/0.4 16 19 13% Cr
17.2/10.7 16 17 13% Cr