PRP 7.5 project

General information

Client Brunei Shell Petroleum 
Project PRP 7.5 project 
Year 2021 
Location Champion North field, Brunei 
Vessels Audacia, Fortitude 
Max. water depth 40 m

Scope of work

  • Installation of one 8-inch (4 km) and four 12-inch (12 km) concrete weight coated pipelines and associated risers and spools in two fields, both located in approximately 30 m water depth and 40 km offshore Brunei.
  • Services for project management, engineering, procurement, fabrication, installation and pre-commissioning of the system.
  • Pre- and post-lay surveys, subsea construction, air diving (risers and spools) and pre-commissioning.

Project specials

  • Allseas’ first project in Brunei

Pipe characteristics

3.433 8 12.7
5.170 12 14.3
1.336 12 14.3
2.180 12 14.3
2.056 12 14.3