Timi

General information

Client Sarawak Shell Berhad 
Project Timi 
Year 2022 
Location Sarawak, Malaysia 
Vessels Audacia, Fortitude 
Max. water depth 145 m

Scope of work

  • Installation of 80.5-km, 16-inch gas pipeline (final 5-km stretch CRA pipe)
  • Riser / tie-in spool fabrication and SAT diving installation, including pre-commissioning
  • Crossing preparations and pre- and post survey

Project specials

  • Allseas first project in Malaysia
  • Fast-track project

Pipe characteristics

75.5 16 15.9 API X65
5 16 15.9 API X65 + 3mm CRA 825/625