Statoil Polarled

General information

Client Statoil 
Project Statoil Polarled 
Year 2015 
Location Norwegian North Sea 
Vessels Solitaire 

Scope of work

  • Fabrication of pipeline heads (at Heusden fabrication yard)
  • Installation of 482 km, 36-inch pipeline
  • Installation of 5 in-line tee structures (including 1 double tee)
  • Pull-in operations at the live Nyhamna Gas Plant, only 5 m from the existing Langeled gas export pipeline to the UK
  • Crossing of 27 existing pipelines and cables
  • Laydown at Aasta Hansteen platform with pipeline collar connector
  • Installation of a 2-km vent line at Aasta Hansteen for commissioning of the Polarled pipeline

.