Shenandoah Pipeline

General information

Client Genesis Energy 
Project Shenandoah Pipeline 
Year 2023 
Location Gulf of Mexico 
Vessels Solitaire 
Max. water depth 1830 m

Scope of work

  • Design & fabrication of installation aids, 2x PLETs, in-line wye (ILY) assembly, in-line valve assembly (ILV) and dual ball valve assembly (DBVA)
  • Design & fabrication of 18-inch and 20-inch VIV strakes (incl. anti-fouling coating)
  • Installation of 4.4 km, 18-inch SCR (incl. titanium stress joint)
  • Installation of 167 km, 20-inch oil export pipeline (incl. PLETs and in-line structures)

Project specials

  • Fatigue testing of SCR welds as part of SCR weld procedure qualification programme
  • Pipeline initiation in a congested area
  • Pipeline installation across a subsea escarpment area