General information

Client Micoperi (PEMEX)  
Project Abkatun 
Year 2019 
Location Bay of Campeche, Gulf of Mexico 
Vessels Tog Mor 
Max. water depth 75 m (245 ft)

Scope of work

  • Installation of 8 km, 8-inch pipeline linking the Onel-A and Manik-A subsea valves
  • Installation of 12-km, 12-inch pipeline connecting the Abkatun-N and Batab-A platforms
  • Multiple pipeline crossings (congested area)
  • Installation of corrosion monitoring joints every 1 km
  • Pipe storage and logistics

Project specials

  • Extremely short-track projects
  • Anchored positioning within crowded infrastructure
  • Use of mid-line buoys