Sur de Texas

General information

ClientInfraestructura Marina del Golfo (TransCanada) 
ProjectSur de Texas 
Installation2017 
LocationGulf of Mexico 
VesselsSolitaire, Tog Mor, Calamity Jane 
Max. water depth100 m

Scope of work

  • Engineering and installation of 685-km, 42-inch pipeline
  • Dual 42-inch pipe pull-out at Altamira and direct 42-inch pipe push-out at Tuxpan
  • 4 x 42-inch pipe above water tie-ins
  • 545 km post-lay trenching
  • Pre-commissioning and testing of the system