Sur de Texas

General information

Client Infraestructura Marina del Golfo (TransCanada) 
Project Sur de Texas 
Year 2017 
Location Gulf of Mexico 
Vessels Solitaire, Tog Mor, Calamity Jane 
Max. water depth 100 m

Scope of work

  • Engineering and installation of 685-km, 42-inch pipeline
  • Dual 42-inch pipe pull-out at Altamira and direct 42-inch pipe push-out at Tuxpan
  • 4 x 42-inch pipe above water tie-ins
  • 545 km post-lay trenching
  • Pre-commissioning and testing of the system