Statoil P12

General information

Client Statoil Petroleum AS  
Project Statoil P12 
Year 2011  
Location West of Bergen, offshore Norway  
Vessels Solitaire 
Max. water depth 350 m (1150 ft)

Scope of work

  • Installation of 63 km, 36-inch pipeline
  • Platform pull-in

Project specials

  • Start-up with pull-in at the Troll A platform in 305 m water depth;
  • Snake lay for over 15 km with 8 curves;
  • Installation of one hot tap tee;
  • 7 crossings for umbilicals and pipelines;
  • Fabrication of heads.
  • Pipe characteristics

Pipe characteristics

62.6 / 38.8 36 22.2/27 C-Mn steel X-65