General informationClientStatoil ProjectStatoil Polarled Year2015 LocationNorwegian North Sea VesselsSolitaire
Scope of workFabrication of pipeline heads (at Heusden fabrication yard)Installation of 482 km, 36-inch pipelineInstallation of 5 in-line tee structures (including 1 double tee)Pull-in operations at the live Nyhamna Gas Plant, only 5 m from the existing Langeled gas export pipeline to the UKCrossing of 27 existing pipelines and cablesLaydown at Aasta Hansteen platform with pipeline collar connectorInstallation of a 2-km vent line at Aasta Hansteen for commissioning of the Polarled pipeline.