Statoil P12

General information

ClientStatoil Petroleum AS  
ProjectStatoil P12 
Installation2011  
LocationWest of Bergen, offshore Norway  
VesselsSolitaire 
Max. water depth350 m (1150 ft)

Scope of work

  • Installation of 63 km, 36-inch pipeline
  • Platform pull-in

Project specials

  • Start-up with pull-in at the Troll A platform in 305 m water depth;
  • Snake lay for over 15 km with 8 curves;
  • Installation of one hot tap tee;
  • 7 crossings for umbilicals and pipelines;
  • Fabrication of heads.
  • Pipe characteristics

Pipe characteristics

62.6 / 38.83622.2/27C-Mn steel X-65