Manta Ray Cameron Highway

General information

ClientManta Ray Gathering Company LLC (El Paso) 
ProjectManta Ray Cameron Highway 
Installation2004 
LocationGulf of Mexico 
VesselsSolitaire, Calamity Jane 
Max. water depth156 m (512 ft)

Scope of work

  • Engineering
  • Pipelay
  • Trenching

Project specials

  • Longest offshore pipeline installed in the Gulf of Mexico
  • Over 60 pipeline and cable crossings
  • No weight coating; pipeline flooded during lay operations to provide sufficient bottom stability
  • Shallow water section trenched to 3 feet cover

Pipe characteristics

380/2403020.6/16.3X70