British Gas NCMA Phase 1

General information

ClientBritish Gas Trinidad and Tobago 
ProjectBritish Gas NCMA Phase 1 
Installation2001 
LocationTrinidad, Gulf of Paria and Ocean North of Trinidad 
VesselsLorelay 
Max. water depth150 m (500 ft)

Scope of work

  • Design
  • Engineering
  • Procurement
  • Fabrication
  • Landfall installation
  • Pre-lay installation of concrete supports
  • Pipelay
  • Trenching
  • Subsea construction
  • Pre-commissioning

Project specials

  • Horizontal directional drill
  • Onshore pipeline construction (2 km)
  • Landfall construction

Pipe characteristics

108/672412.7/22.5X65